Infrastructure
Cape's Berg River Dam on line
Reducing demand
The conditional go-ahead for the project from the department was dependent on the city reducing its water demand by 20%. In response, the city implemented a water conservation strategy aimed at reducing the use of water by using treated sewage effluent instead of fresh water for irrigation and industrial purposes. As a result of this strategy, and because people have become more aware of the value of water and are trying harder to conserve it, the council is experiencing a 25% saving. "Although the dam will alleviate immediate water shortages, it is imperative that Cape Town residents continue to use water sparingly and that, in a relatively arid province, we continue to develop a culture of saving water," Cape Town Alderman Clive Justus said in Franschoek last week.South African first
The Berg River Dam was the first dam in South Africa to be designed, constructed and operated in accordance with the guidelines of the United Nations World Commission on Dams. The concrete-faced, rock-fill dam, located in the upper reaches of the Berg River catchment area, is 250 metres above sea level. It consists of an embankment of rock mined from the river bed and surrounding area, with an impermeable 300mm layer of concrete on the upstream side. The dam wall is 68 metres high and 929 metres long. The civil engineering and operational design of the dam and the downstream supplement ccheme was predicated on the need to maintain the ecological integrity of the river. The operating rules provide for specific volumes of water to be released from the dam to maintain the flow and integrity of the Berg River downstream of the dam.Supplement scheme
In addition to the dam itself, the project entails a supplement scheme located 10 kilometres downstream of the dam, alongside the Drakenstein (formerly Victor Verster) prison. The function of the supplement scheme is to divert winter high flow, entering the Berg River from the Franschhoek, Wemmershoek and the Dwars River tributaries, to supplement water stored in the dam. Water from the scheme is pumped via the Drakenstein pump station, along a 9.5km pipeline, back up to the Berg River Dam. Indigenous plants have been planted on the downstream face of the dam wall, which is visible from the main road into Franschhoek, ensuring that the dam and associated structures blend with the surrounding landscape. At the start of the contract, the Working for Water Programme was awarded a R21-million, eight-year contract by Trans-Caledon Tunnel Authority to remove alien vegetation from the Berg River catchments, significantly increasing the amount of water available for storage in the dam and for indigenous plant species. After completion, the dam was transferred from tunnel authority to the department, who operate and maintain it as part of their Western Cape water supply systemid. Source: BuaNews
The shore of the Berg River Dam near Franschoek in the Western Cape. The dam was completed in 2007 at a cost of R1.5-billion (Photo: Franschoek.co.za)
Related links
Related articles
- SA's tap water 'safe to drink'
- R7.3bn water project approved
- Limpopo gets R7.4bn water project
- More with houses, running water
- SA's water saving campaign
- UN praise for SA water delivery
- Berg dam nears completion
- R2.1bn water project gets nod
- Nod for Limpopo's De Hoop dam
- N West's R530m water project
- Africa's biggest water project